LandalystLandalyst
Bill of Quantities

Know what your build should cost — before you commit.

A Bill of Quantities prepared by an MNIQS-registered Quantity Surveyor, priced with verified market rates from this month.

How it works

From drawings to a signed BoQ.

Step 01Send your drawings

Architectural drawings, plus structural and MEP if you have them, the build location, and any preferences on finish level or specification.

Step 02We quote a fixed fee

A Quantity Surveyor reviews the scope and comes back with a fixed fee. Nothing is charged until you accept it.

Step 03We measure and price

Quantities are taken off your drawings element by element, then priced line by line.

Step 04You receive your BoQ

A complete, signed document — ready to put in front of any contractor.

What you receive

Three things that make the number trustworthy.

Rates from this month, not last year

Every item is priced against building-material prices our team recorded across Lagos markets this month, with the vendor and market noted beside the figure.

Costs split by phase

A total build cost with a stated contingency, then broken down phase by phase — so you can plan each stage payment instead of guessing what the next transfer should be.

Signed by a registered QS

Measured quantities for the whole build, explained in plain English, prepared and signed by a Quantity Surveyor who stands behind the numbers.

Frequently asked.

How much does a Bill of Quantities cost?+

It's quoted per project, because scope and building size vary enormously — a three-bedroom bungalow and a block of flats aren't the same job. Send your drawings and we'll come back with a fixed fee. You pay nothing until you accept the quote.

How is this different from a contractor's quote?+

A contractor's quote tells you what that contractor wants to charge for the scope they've assumed — which is why every contractor quotes a different scope at a different number, and none of them are comparable. A BoQ defines the scope independently and prices it at market rates, so you can compare quotes on identical terms and see immediately where someone is padding.

Do you need to visit the site?+

No. A Bill of Quantities is measured from your drawings, so we can prepare it wherever the build is. That's why it works well before construction starts, or from abroad. If you also want the site's current stage independently verified, that's what our cost reports are for.

Where do the rates come from?+

Our own market data. Our team records building-material prices across Lagos markets every week, logging the material, brand, unit, vendor, market, and date. Your BoQ is priced against those current rates, not against a dated published schedule.

Can I use the BoQ to get contractors to bid?+

Yes — that's one of the best uses for it. Hand the same BoQ to every contractor and they all price the same measured scope, which turns a set of incomparable numbers into a fair tender.

What drawing formats do you accept?+

PDF, DWG, DXF, images, and spreadsheets. If your set is large, zip it. If you can't upload the files, submit the form and send them to us on WhatsApp instead.